17.5x32x1 Air Filter (MERV 8) (4-Pack) Dust & Allergy Control AC Furnace Filters, MADE IN USA, HVAC, Pleated, Electrostatic

17.5x32x1 Air Filter (MERV 8) (4-Pack) Dust & Allergy Control AC Furnace Filters, MADE IN USA, HVAC, Pleated, Electrostatic (Actual Size: 17.5 x 32 x.75)

$146.52
Sale price  $146.52 Regular price  $293.04
Skip to product information
17.5x32x1 Air Filter (MERV 8) (4-Pack) Dust & Allergy Control AC Furnace Filters, MADE IN USA, HVAC, Pleated, Electrostatic

17.5x32x1 Air Filter (MERV 8) (4-Pack) Dust & Allergy Control AC Furnace Filters, MADE IN USA, HVAC, Pleated, Electrostatic (Actual Size: 17.5 x 32 x.75)

$146.52
Sale price  $146.52 Regular price  $293.04

The 17.5x32x1 Air Filter (MERV 8) (4-Pack) Dust & Allergy Control AC Furnace Filters, MADE IN USA, HVAC, Pleated, Electrostatic (Actual Size: 17.5 x 32 x.75) is listed in our Furnace Filters collection. Use the verified features and specifications below to compare it with your space, equipment, and intended use.

Key features

  • FILTER: This is a MERV 8 rated 4 pack Air Conditioner Filter | Size: 17.5" x 32" x 1" - Actual Size: 17.5" x 32" x.75".
  • MADE IN USA: Fully manufactured in the United States. Made from the highest quality materials and construction. (EPA Establishment Number: 103501-FL-1).
  • MAX PERFORMANCE: Our filters can last up to 90 DAYS before needing replacement. We do recommend to change your home air filter every 30 - 90 days for 1 inch filters. This will help maintain the longevity of the intended application like A/C and heaters.
  • CAPTURE MORE: Protect your home! The pleated design captures more particles and extends lifetime of the filter. Merv Filters trap airborne particles without impacting air flow. Feel the difference in 48 hours.
  • FAST & EASY INSTALLATION: Open, Slide and Close! A simple yet effective replacement air filter for your home.

Product details

  • Material: Paper
  • Product Dimensions: 32"L x 17.5"W x 0.75"Th
  • MERV Rating: 8
  • Compatible Devices: Air Conditioner, Furnace
  • Global Trade Identification Number: 00023688234420
  • Number of Items: 4
  • Unit Count: 4.0 Count

Before ordering

Confirm the dimensions, power requirements, replacement-part compatibility, included pieces, and care instructions shown for the selected item. Current price, inventory, shipping, and taxes are confirmed at checkout.

Frequently asked questions

What kind of product is this?

This item is categorized as Furnace Filters.

What should I check before buying?

Compare the listed measurements, materials, power source, capacity, and compatibility details with your requirements.

Where can I confirm availability?

Use this product page and checkout for the current selling price, discount, inventory, delivery options, and applicable taxes.

You may also like